Dijitalis

Planla, Uygula, İşlet

graphical divider
Please sign in first to be able to see company contact info. Click here to sign in.

Product Main Category: Simulation

Type

Discrete event

Application area

Warehouse operation setup and optimization
Quantity and type of transportation and material handling equipment
Floor space requirements and layout
Loading and unloading station requirements
Warehouse operational expenses
Performance metrics such as execution time, resource utilization rates, inventory levels
3D plant simulation
Static and dynamic collision detection
Assembly and robotic path planning
Resource modeling (3D and kinematics)
Robotic process simulation
Virtual commissioning

Software support

Other

Role in the market

Distributor
First installation of the solution (year): 2008-07-25
Number of installations (customer, company) of the solution in operation: 45
Number of installations (customer, company) of the solution (own customers) serviced by company: 45

Pricing model

Licence per named users
Licence per concurrent users
Free of charge (Pilot Phase)

Maintenance service areas

Hotline and support
Online portal (Incident Management)
Supply of bugfixes and updates
Supply of new releases
Transfer of individual customisations into the new release version
Release changes (service)
Online portal for knowledge management
On-site service and maintenance
Remote Maintenance

Application areas (Process)

Maintenance
Warehouse Management
Quality
Planning
Project Management
Inventory
Strategic Planning & Management
Production

Application areas (Operational)

Planning
Control
Training
Data analysis
Data analytic
Visualization
Automation
Optimization
Design
Product development

Target customer structure

Business-to-business
Manufacturing

Target customer production structures

Project based manufacturing
Single unit, small series manufacturing
Variants manufacturing
Series manufacturing
Mass manufacturing

Supported production models

Discrete Manufacturing
batch manufacturing
process manufacturing

Industry focus

Sector-independent solution

Number of employees (Fit)

1-4 employees
5-9 employees
10-19 employees
20-49 employees
50-99 employees
100-249 employees
250-499 employees
500-999 employees
1000-4999 employees
more than 5000 employees

Typical project budgets (licences and implementation)

up to ca. 25.000 USD

Typical duration of an implementation project

"Plug & Play" (max. 2 weeks)

Application Development Tools and Platforms

Windows

Solution programming languages (Programming, Scripting & Markup)

Javascript
.Net
Java
C#
C++
C
Low-code

Supported languages (GUI, user interfaces)

English

Supported data transfer/integration standards

File transfer
Databese (SQL, Oracle,…)
DDE (Dynamic Data Exchange)
COM/DCOM/ActiveX
COM (Internal COM Server)
OPC
Web Services
APIs
Connector

Product Main Category: Simulation

Type

Discrete event

Application area

Production planning optimization and scheduling
Facility design and manufacturing capacity planning
Inventory planning (WIP and raw materials)
Transportation planning and optimization
Supply chain design
Logistics network optimization
Warehouse operation setup and optimization
Strategic and tactical logistics plan definition, feasibility and cost evaluation
Optimal fleet management
Operational transportation and fleet control based on the real-time data monitoring
Risk management in transportation logistics
Freight traffic flows
Performance metrics such as execution time, resource utilization rates, inventory levels
Operations planning, maintenance scheduling, routing and positioning
Assess the impact of manufacturing investment

Software support

Other
No data entered!

Product Main Category: Virtual Reality

Type

Wired
Mobile
Haptic
Multi Sensory

Control unit

HTC Vive
Oculus DK1
Oculus DK2
Oculus Go
Oculus Quest
Oculus Rift / S
Valve Index
No data entered!

Product Main Category: Simulation

Type

Discrete event
Agent-based
Continuous
Hybrid

Application area

Production planning optimization and scheduling
Process improvement, bottleneck analysis
Six Sigma process improvement
Resource allocation: staff and equipment
Facility design and manufacturing capacity planning
Production line balancing
Inventory planning (WIP and raw materials)
Warehouse operation setup and optimization
Risk management in transportation logistics
Quantity and type of transportation and material handling equipment
Floor space requirements and layout
Loading and unloading station requirements
Staff level requirements
Warehouse operational expenses
Operational timetables
Performance metrics such as execution time, resource utilization rates, inventory levels
3D plant simulation
Energy analysis tools for calculating and optimizing energy usage
Assess the impact of manufacturing investment

Software support

Simio

Role in the market

Distributor
First installation of the solution (year): 2006-08-15
Number of installations (customer, company) of the solution in operation: 30
Number of installations (customer, company) of the solution (own customers) serviced by company: 30

Pricing model

Licence per named users
Licence per concurrent users
Subscription
Free of charge (Pilot Phase)

Maintenance service areas

Hotline and support
Online portal (Incident Management)
Supply of bugfixes and updates
Supply of new releases
Transfer of individual customisations into the new release version
Release changes (service)
Online portal for knowledge management
On-site service and maintenance
Remote Maintenance

Application areas (Process)

Maintenance
Warehouse Management
Planning
Inventory
Strategic Planning & Management
Production

Application areas (Operational)

Planning
Efficiency
Training
Data analysis
Data analytic
Visualization
Optimization
Design

Target customer structure

Business-to-business
Manufacturing

Target customer production structures

Project based manufacturing
Single unit, small series manufacturing
Variants manufacturing
Series manufacturing
Mass manufacturing

Supported production models

Discrete Manufacturing
batch manufacturing
process manufacturing

Industry focus

Sector-independent solution

Number of employees (Fit)

250-499 employees
500-999 employees
1000-4999 employees
more than 5000 employees

Typical project budgets (licences and implementation)

up to ca. 50.000 USD
up to ca. 100.000 USD

Typical duration of an implementation project

"Plug & Play" (max. 2 weeks)
Short duration (up to app. 2 months)
Medium duration (up to app. 6 months)

Application Development Tools and Platforms

Windows

Solution programming languages (Programming, Scripting & Markup)

Low-code

Supported databases

mySQL
MS SQL-Server
MS Access
On Premise

Supported languages (GUI, user interfaces)

Turkish
English

Supported data transfer/integration standards

File transfer
Databese (SQL, Oracle,…)
DDE (Dynamic Data Exchange)
COM/DCOM/ActiveX
APIs

Integration with high-level systems

SAP Business All-in-One
SAP Business ByDesign
SAP Business One
SAP Business Suite
SAP S/4HANA
No data entered!
No data entered!
No data entered!
No additional documents were uploaded.
divider graphic

Didn't find the product / service you were looking for?

arrow-up icon